
Description
Flowline Stainless Steel Cocktail Station Trolley – With Ice Well, Glass Rack Storage & Garnish Trays
The Flowline Cocktail Station Trolley is a premium, mobile cocktail prep station designed for professional bars, restaurants, and event venues. Built from 1.2mm 304-grade stainless steel, it combines functionality, hygiene, and durability in a compact and mobile design perfect for high-volume service areas.
This commercial cocktail station includes a deep stainless-steel ice well with drain, bottle speed rails, and recessed GN tray compartments for limes, herbs, and garnishes. Under the main workbench sits a dedicated space for 500x500mm glass racks, allowing bartenders to keep clean glasses within easy reach while maintaining an organised, clutter-free workspace.
Mounted on heavy-duty lockable castors, the trolley glides effortlessly through service zones and event spaces. Every detail — from its smooth-polished No.4 finish to its fully welded seams — reflects Flowline’s commitment to premium craftsmanship and long-term commercial performance.
Ideal for cocktail bars, hotels, pop-up events, catering setups, and outdoor service areas, this stainless-steel cocktail station is engineered for workflow efficiency, easy cleaning, and a professional front-of-house look.
Key Features
-
Premium 1.2mm 304-grade stainless steel with polished No.4 finish
-
Integrated ice well with drain for quick service and hygiene
-
Under-bench storage for 500x500mm glass racks
-
Built-in bottle speed rails for spirits and mixers
-
GN tray compartments for limes, herbs, and garnishes
-
Fully welded frame with smooth polished edges
-
Heavy-duty lockable castors for mobility and stability
-
Perfect for cocktail bars, function venues, hotels, and outdoor events
- Glass Racks Excluded
Specification
| SKU | FLCST500 |
|---|---|
| Brand | Flowline Stainless Systems |
| Width (mm) | 429 |
| Depth (mm) | 800 |
| Height (mm) | 900 |
Delivery Information
Brandon delivers Australia-wide, typically within around 14 business days of a successful payment. Deliveries run Monday to Friday.
Standard freight is kerbside delivery — additional options such as tailgate, two-person or placement delivery are available on request. All delivery times are estimates and may vary with courier network volumes.
Warranty
All equipment is covered by an Australian standard manufacturer's warranty against defects in materials and workmanship for commercial use.
Warranty periods vary by manufacturer — contact us for the specific cover on this product. This is in addition to your rights under the Australian Consumer Law.
Enquire on this product
Send the plan, consultant schedule or rough dimensions and Brandon can price this item and advise practical details before it becomes a site issue.
Similar Products




Bench
Cabinets
Shelving
Canopies
Bar Fridge
FRIDGE
Undercounter Fridge
Upright Fridge
Ice Machine
Deli Display Fridge
Wine Fridge
Salad Bar Fridge
Pizza Prep Fridge
Custom Cool Room
Custom Display Refrigeration
Custom Salad Prep Fridge
Custom Upright Fridge
Custom Meat Cabinet and Butcher fridge
FREEZER
Under Bench Freezer
Display Freezer
Blast Chiller
Upright Freezer
Chest Freezer
Custom Freezer Room
Custom Display Freezer
Custom Upright Freezer
Cooking Equipment
Cooktop
Deep Fryer
Griddle
Pasta Cooker
Combi Oven
Chargrill
Stock Pot Burner
BBQ
Convection Oven
Deck Oven
Warewashing
Passthrough Dishwasher
Underbench Dishwasher
Conveyor Dishwasher
Glasswasher
Dishwasher Rack
Dishwasher Accessory
Benchtop Equipments
Microwave
Fryer
Warmer
Cooker
Grill
Griddle
Toaster
Peeler
Slicer
Filler
Grinder
Vacuum Sealer
Holding Cabinet
Warming Cart
Prep Machine
Food Processor
Food Dehydrator
Custom Hot Display Bar
Restaurants
Cafes
Bars and Nightclubs
Hotels
Bakeries
Juice Bars
Supermarkets
Butchers
Food Truck
Medical
School and centers
Age-Care
Commercial Builders
Franchies
Pizza Shops
Dessert Shops