FlowLine Stainless System – Adjustable Glass Rack
Easy Kitchens
Shipping calculated at checkout.
-
- Backordered, shipping soon
SEAL a DEAL, email enquiry@brandon.com.au or call us 03 9555 3333 and press Sales
Model: FLGR4
The FlowLine™ Stainless System Adjustable Glass Rack is a durable, freestanding storage solution designed for flexibility, hygiene, and long service life in busy hospitality environments. Built from 25 mm 304-grade stainless steel tubing, the unit offers exceptional strength and corrosion resistance, ensuring long-term reliability in wet areas.
Featuring four pairs of adjustable trays, the rack can be configured for four storage tiers or three tiers and a drip tray, allowing easy accommodation of various glass sizes and cleaning workflows. The notched channels are precision-welded to the frame for enhanced rigidity and stability during daily use.
Fitted with leg inserts and stainless disc feet, the FlowLine™ rack sits securely and evenly on any surface, reducing the risk of movement or tipping. Suitable for standalone use or as a bench support system, this unit provides a clean, professional solution for storing or drying recently washed glassware.
Dimensions: 830 (H) × 429 (W) mm
Constructed from 25 mm 304-grade stainless steel
Four pairs of adjustable trays for flexible storage
Configurable for 4 tiers or 3 tiers + drip tray
Notched channels welded to frame for durability
Includes leg inserts and stainless disc feet for stability
Can also function as a bench support frame
| SKU | FLGR4 |
|---|---|
| Brand | Easy Kitchens |
| Width (mm) | 429 |
| Depth (mm) | 500 |
| Height (mm) | 830 |
| SKU | FLGR4 |
|---|---|
| Brand | Easy Kitchens |
| Width (mm) | 429 |
| Depth (mm) | 500 |
| Height (mm) | 830 |
Manufacturer's Warranty 24 Months
Use collapsible tabs for more detailed information that will help customers make a purchasing decision.
Ex: Shipping and return policies, size guides, and other common questions.
Subscribe today to hear first about our sales
Brandon Hospitality: Crafting Culinary Excellence, One Kitchen at a Time.